Skip to content
DeltaLedger
Interactive demonstration — Nova Robotics, Inc. (fictional) — read-only
← Demo introduction

ECO-1042: Main Compute PCBA Rev B → Rev C

Read-only

Transition the Main Compute PCBA from Rev B to Rev C to resolve thermal throttling caused by an obsolescence-driven voltage-regulator substitution. The new pinout requires the Compute-to-Drive Wiring Harness to move from Rev 1 to Rev 2 as well.

Closed all four mitigation outcomes: two PCBA cancellations, one accepted PCBA loss and one harness conversion. — 7/29/2026, 8:14:45 PM

Current financial position

$74,000.00

Exposure certainty

100%

BOM DIFF

2 changes detected
Between the current and proposed BOM, computed deterministically.

Why this matters

Identify exactly which parts and quantities changed before financial analysis begins.

DeltaLedger uses

A current BOM and a proposed BOM (.xlsx, .xls, or .csv, up to 4 MB each).

You are done when

Both files are imported and every added, removed, replaced, or quantity-changed line is visible below.

This engineering change is read-only. Actions below are disabled for this scenario.
Current

apex2000_current_bom.csv

4 lines · imported today

Proposed

apex2000_proposed_bom.csv

4 lines · imported today

BOM comparison complete

2 change(s) detected between current and proposed BOM.

Part numberChange typeFrom qtyTo qty
APX-8801Breplaced11
APX-4415-1replaced11